【Case】8-10tons/hour granule production line
The customer is a sludge pellet plant in South Korea.
Nature of construction: new
Construction scale: annual output of 25,000-30,000 tons of granules
The production line operators: 6-7 people, 2 people at the feed inlet, 1 person for mixing, 1 person for granulation, 1 person for packaging system, 1 person for control room
country | Time | production line | Yield | area |
Korea | 2020.6.12 | Sludge granulation production line | 8-10 tons/hour | As per the design drawing |
Korea 8-10 t/h wood pellet production line solution
Capacity: 8-10 tons/hour
Raw materials: mainly composed of sludge or sludge with wood chips, straw and other crude fiber raw material mixtures, of which sludge is divided into industrial sludge and domestic sludge. Industrial sludge mainly includes paper sludge and sludge produced by industrial wastewater treatment stations, while domestic sludge mainly includes river sludge and urban sewer sludge.
Application: For biomass power plant/biomass steam boiler/household fireplace/drying furnace/biomass gasifier
:≥1100kVA。
How to build a biomass pellet production line?
Examine the quality, price, and quantity of raw materials, and also consider the factors of long-term supply (i.e., long-term control), so that we can plan the configuration of the production line and analyze the cost of raw materials according to the configuration of the production line. Once the raw materials have been decided, it is necessary to determine the plant. The construction of the plant or looking for a place that is generally close to the raw material or convenient transportation. It's best to have both. Energy consumption. The pelletizing industry consumes a lot of electricity. After determining the production capacity, purchase a transformer that matches the production capacity according to the equipment power selection provided by the equipment manufacturer. Purchase equipment. Before buying equipment, you must first understand the product quality of the equipment manufacturer. In the network environment, it is often difficult to distinguish between good and bad product quality. For equipment installation and commissioning, Rongda will send technical personnel to provide guidance, installation, commissioning and training.
【Case】8-10tons/hour granule production line
The customer is a sludge pellet plant in South Korea.
Nature of construction: new
Construction scale: annual output of 25,000-30,000 tons of granules
The production line operators: 6-7 people, 2 people at the feed inlet, 1 person for mixing, 1 person for granulation, 1 person for packaging system, 1 person for control room
Production line design drawing:
Process:
Core equipment of the project:
The name of the device | Model | Yield | Power consumption | |
![]() | RD678MX | 2.5-3 | 196.50 | |
![]() | SFSP68x120 | 3-4 | 160.00 | |
![]() | SCY150x2500 | 8-12 | 2.20 | |
![]() | SFJH150×1d | 5-20 | 7.50 | |
![]() | Pendulum cooling machine | SKLB8 | 10-20 | 0.75 |
Other equipment | Packing machine/transport system/electric control/dust removal |
Customer's main raw materials:
Sludge/wood chips Packaging system included (Y/N): Yes, this is included in the complete product line
With or without boiler system (Y/N): No boiler
Is it a customized solution? (Yes/No): Yes, this is a custom plan.
Scope of application: This production line is used for sludge particles
The installation period of this project is 60 days
Number of required installers: 2 people
Service Support:
Drawing:
Flow chart;
installation drawings;
operating instructions;
Layout of wood pellet production line in workshop;
Equipment installation drawing;
steel bracket installation drawing;
Detailed steel structure drawings and bill of materials
Whether the customer comes to the factory for inspection (Y/N): pay online and place an order
Problems in the installation process: Rongda's professional installation team can help customers install and solve problems in the installation process.
One-stop after-sales service:
send two technical and installation engineers to guide the installation. After the installation and commissioning were completed, we conducted operation training for the customer's workers;
Train workers on how to maintain and protect, and depending on the function, we will develop complete maintenance rules for you, including how, when, and by whom.
Our company's after-sales department will regularly call customers to inquire about the maintenance situation and provide suggestions. In addition to wearing parts, our company provides one year free warranty and permanent free technical support.